中国汽车工程师之家--聚集了汽车行业80%专业人士 

论坛口号:知无不言,言无不尽!QQ:542334618 

本站手机访问:直接在浏览器中输入本站域名即可 

  • 1040查看
  • 1回复

CBR的档位获取

[复制链接]
  • TA的每日心情
    开心
    28-9-2023 10:13
  • 签到天数: 4 天

    [LV.2]偶尔看看I

    发表于 21-7-2012 14:43:31 | 显示全部楼层 |阅读模式

    汽车零部件采购、销售通信录       填写你的培训需求,我们帮你找      招募汽车专业培训老师


    在国外论坛看到CBR的档位获取方法,但是不是很懂大概就是安装一个旋转电位计在空挡那个位置:he body of the pot (the green thing) bolts to the 90 deg flat to stop the entire pot from rotating, the shaft of the pot is then locked in by a grub screw to the rotating shaft in the centre of the body, then the whole assembly is installed in the neutral hole (you can see the two flats on the body of the fitting for a spanner) .Inside the body there are 2 O'rings to seal the rotating shaft against oil. Once the fitting is installed in the engine a small gear is attached to the small stub you can see at the end of the threaded section which is the end of the rotating shaft, this gear meshes with an identical one already installed on the end of the shifter drum (pic 1), we already run a microcontroller for a pneumatic shifting system so we just input the signal to an A/D pin on the chip and drove a seven segment display with it.

    快速发帖

    您需要登录后才可以回帖 登录 | 注册

    本版积分规则

    QQ|手机版|小黑屋|Archiver|汽车工程师之家 ( 渝ICP备18012993号-1 )

    GMT+8, 21-5-2024 10:32 , Processed in 0.188015 second(s), 27 queries .

    Powered by Discuz! X3.5

    © 2001-2013 Comsenz Inc.